Complex energy projects often suffer from fragmented management, where engineering, procurement, and construction are handled by different entities. At NRG Solutions, we champion the Integrated EPIC (Engineering, Procurement, Installation, and Commissioning) model to eliminate these silos.

By providing a single-source platform, we ensure that the Front-End Engineering Design (FEED) is perfectly aligned with the procurement phase and the final installation. This synergy is particularly crucial for brownfield modifications and facility upgrades, where precision is required to tie new modular units into existing infrastructure. In this post, we break down the lifecycle of an EPIC project and show how integrated management reduces risk, ensures HSE compliance, and delivers projects on time and within budget.

Leave a Reply

Your email address will not be published. Required fields are marked *

NRG Solutions Limited | All Right Reserved 2025